The Difference Between Sizing a Pump and Engineering a Pumping System

It would make engineering easier if all water came at the same rate.

It doesn’t.

The amount of waste that enters a residential water system can change throughout the day. Industrial and commercial structures may have operating periods of peak. Stormwater levels can drastically change with the weather. The demand for clean water also fluctuates according to the type of application.

It’s not enough just to choose equipment that is able to achieve a specific flow rate when designing an equipment pumping station. Engineers must understand the range of conditions the system is expected to face.

Image credit: romtecutilities.com

Don’t only think about capacity but also operational conditions

The maximum flow is important however it’s just one aspect of the station’s operations. Imagine that a wastewater treatment system was created to handle a huge peak flow. In most cases the flows coming in can be significantly lower. In these times, the station must still function properly.

It also raises issues related to wet-well sizing and the size of the pump as well as control of head condition, how to modify equipment when demand shifts.

A properly engineered package pumping system brings these considerations together around the actual requirements of the site instead of treating maximum pump capacity as the entire design objective.

The Daily Routine of Wastewater

The conditions of the influent at the wastewater liftstation that serves households business, municipal infrastructure or even businesses could change in the course of the operation.

The system needs to collect the wastewater and turn on its pumps according to the strategy of control established for the station. The dimensions of the structural structure, the pumping equipment, valves electric components, and controls play a role in the process.

Design could also incorporate additional considerations specific to the site. Romtec Utilities is able to include additional equipment, such as grinder vaults and odor control equipment, depending on the application. This results in a station that is engineered to fit the specific project rather than being a standard design which can be applied to all wastewater sources.

Stormwater is able to change significantly faster

Stormwater presents a very different operating situation. A stormwater station is usually quiet in dry weather conditions, but receive a huge flow of water during a severe weather storm. Stations could be a component of larger flood control, detention or treatment strategies and therefore the stormwater plan is an essential part of system design.

Romtec Utilities takes into consideration things like the flow rate that is required, the head conditions, the size of the system as well as the needs of the location and environmental concerns when designing these systems.

Stations that serve commercial developments could look very different than those designed for municipal stormwater applications.

Head Conditions Matter Along With Flow

The challenge of moving 1,000 gallons not the only engineering challenge. Engineers must also know where the water is going to go and the level of resistance required by the pumping system.

The changes in elevation, the piping configuration the discharge conditions and other system characteristics influence the head conditions in which pumps function.

This relation between head and flow is another reason why choosing a pump solely based on its ratings isn’t enough. The design and technology of the pump should be able to meet the requirements of hydraulics of the particular application.

Create the station to meet the actual conditions it will be exposed to

Romtec Utilities develops customized pumping systems for wastewater, stormwater clean water, booster, industrial, and many other uses. The procedure may involve the preliminary design and budgeting process plans, complete sets of plans as well as documentation and startup, testing and commissioning.

The basic principle of engineering is that the real pumping system don’t operate under the same set of conditions.

They should also take into consideration the specific hydraulic requirements of the project, as well as changing flow, demand, and requirements. This fact should be considered when designing a successful station.